April 11 (Reuters) - U.S. DEPARTMENT OF TRANSPORTATION’S PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA):
REPORTS THAT IT HAS DISPATCHED EIGHT INSPECTORS TO INVESTIGATE THE CAUSE OF SOUTHBOW OPERATED KEYSTONE PIPELINE RUPTURE
REPORTS THAT SIX INSPECTORS ARE ON SITE IN NORTH DAKOTA, AND TWO INSPECTORS ARE STATIONED AT THE OPERATOR’S CONTROL ROOM IN CALGARY TO CONDUCT INTERVIEWS
SAYS ABOUT 3,500 BARRELS OF PRODUCT HAS BEEN RELEASED AT THE SITE
SAYS 910 BARRELS HAVE BEEN CLEARED BY THE PIPELINE OPERATOR TILL NOW